Sparks Road - Warnervale
Project featuring a concrete crib wall.
Call Us Now
(02) 9654 9055
General Information
2.2m high, 100mlong cribwall was constructed adjacent to a fire access road retaining insitu cuttings at Lakes Grammer School. This design & constuct solution was an alternative to traditional reinforced concrete blockwork retaining wall. The works was completed within 10 days from bulk excavation through to final battering of top of wall profiling to achieve athe wall.

Project Specs
- Product - Concrib MAXI & MIDI cribwall
- Size - > 140m2
- Height: 2.2m
- Development time - 10 days
Featured Case Studies
-
Lower Molonglo
WQCC - ACTThe Lower Molonglo project is a 4.5m high, 135m long Concrib® wall stabilising a cut embankment... Read more.
-
Weakleys Drive
InterchangeThe Weakleys Drive Interchange project involved the elevation of the New England Highway over the intersection with Weakleys Drive and... Read more.
-

Butu Wargun Dr
Greystanes6.8m high reinforced soil wall, 325m long retaining proposed factory approx 3m from TOW. Due to heavy vertical loadings & influence of... Read more.
-
Sparks Road
Warnervale2.2m high, 100mlong cribwall was constructed adjacent to a fire access road retaining insitu cuttings at Lakes Grammer School. This design... Read more.