Lower Molonglo WQCC - ACT
Project featuring a Concrib® MACRO, MAXI & MIDI system.
Call Us Now
(02) 9899 2111
General Information
The Lower Molonglo Water Quality Control Plant involved the upgrade of secondary treatment facilities including the construction of three secondary clarifiers, RAS pumping stations, anoxic tanks, level control structure, MCC building, pipelines, methanol dosing facility, MLR pumping stations, Bioreactor modifications, access roads and associated earth retaining structures. More specifically the project involved the construction of a 135lin.m long, 4.5m high Concrib® cribwall to stabilise an existing cut 3:1 embankment batter. The system adopted was the CONCRIB precast segmental crib retaining wall system.
Retaining solutions was engaged the design, supply and install the cribwall system. The footings were located within mostly HW/MW or less weathered strong dacite bedrock.

Subsequent jointing was inherent which required the use of a reinforced concrete footing. Certain area of the cut embankment required battering @ 1:1 profile with application of stripdrain, mesh and shotcrete. All foundation verification and embankment stabilisation measures were carried out by ACT Geotechnical Engineers Pty Ltd.
The retaining wall was completed in approximately 4 weeks with ongoing plant wet-hire for another 6 months for general earthworks and backfilling around structures using 5tonne, 20tonne and tracked loaders owned by Retaining Solutions. Rock hammers were utilised with zero swing machines due to tight access between structures.
Project Specs
- Application - Cut Embankment Stabilisation
- Product - Concrib® MACRO, MAXI, & MIDI system
- Finish - Plain Grey
- Area - 420m2
- Max. Height - 4.5m
- Length - 135m
- Loadings - 5kPa & 3:1 batter
- Design life - 60 years
- Owner - ActewAGL Distribution
- Client - Abergeldie Contractors PtyLtd
- Construction - 4 weeks
Featured Case Studies
-
Lisarow Aged Care Facility
Astoria projects are constructing a new Aged Care Facility at Lisarow, as part of a staged development.... Read more.
-
Central Coast Highway Upgrade
The Carlton to Matcham Road project involved the widening of the Central Coast Highway (HW30) at the Serpentine... Read more.
-

Cattai Creek
GlenhavenThe project involved the construction of 52.1m long & 16.1m wide super-T girder bridge, approach roadworks... Read more.
-
Potts Hill
Infrastructure WorksThe Potts Hill reservoirs site has been used by Sydney Water for more than 100 years and plays a role in... Read more.


Like This Project