Butu Wargun Drive – Greystanes
Project featuring a KeySteel & Keystone / Geogrid wall.
Call Us Now
(02) 9654 9055
General Information
6.8m high reinforced soil wall, 325m long retaining proposed factory approx 3m from TOW.
Due to heavy vertical loadings & influence of building close to wall active wedge with dead & live loads in excess of 25kPa, KeySteel was used for the main wall with wall returns utilising a Keystone/Geogrid solution.

Project Specs
- Product - KeySteel & Keystone/Geogridcribwall
- Size - > 1900m2
- Height - 6.8m
- Client - Australand Holdings Pty Ltd
Featured Case Studies
-
Lower Molonglo
WQCC - ACTThe Lower Molonglo project is a 4.5m high, 135m long Concrib® wall stabilising a cut embankment... Read more.
-
Weakleys Drive
InterchangeThe Weakleys Drive Interchange project involved the elevation of the New England Highway over the intersection with Weakleys Drive and... Read more.
-

Butu Wargun Dr
Greystanes6.8m high reinforced soil wall, 325m long retaining proposed factory approx 3m from TOW. Due to heavy vertical loadings & influence of... Read more.
-
Sparks Road
Warnervale2.2m high, 100mlong cribwall was constructed adjacent to a fire access road retaining insitu cuttings at Lakes Grammer School. This design... Read more.
