Precast Panel Reinforced Earth Wall Case Studies
Bridge over Cattai Creek
Glenhaven, NSW
Type: RECO TerraClass® System
The project involved the construction of 52.1m long & 16.1m wide super-T girder bridge, approach roadworks, reinforced earth wall abutments taking full loads applied from bridge abutments and crash barrier parapet arrangement... more info.
Potts Hill Eastern Precinct Infrastructure Works, NSW
Type: RECO TerraClass® System
The Potts Hill reservoirs site has been used by Sydney Water for more than 100 years and plays a role in supplying water to Sydney. Sydney Water no longer requires portions of the site for operational purposes. In partnership with Sydney Water, Landcom has... more info.
Clermont Coal Mine,
Near Emerald, Central QLD
Type: RECO TerraClass® System
RIO TINTO COAL AUSTRLIA is currently constructing the Clermont Mine, located 12 km northwest of the township of Clermont in Central Queensland. When the mine reaches full capacity (expected in 2013) it will produce up to 12.2 million tonnes of thermal coa ... more info.
Leura To Katoomba Stage 2,
Blue Mountains NSW
Type: RECO TerraClass™ System
The project involved the widening and realignment of the Great Western Highway between Leura and Katoomba in the Blue Mountains, west of Sydney. The upgrading of the infrastructure in this area dramatically improved travel times for motorists... more info.
Wambo Coal Mine CHPP Upgrade,
Hunter Valley NSW
Type: RECO TerraClass™ System
Kinmont Engineers were engaged for the design and development for the structural and civil design and detail of a major upgrade to the Coal Handling Preparation Plant (CHPP) at Wambo Coal Mine, Hunter Valley NSW... more info.
Wilpinjong Coal Mine,
Mudgee NSW
Type: VSoL Panel System
Wilpinjong Coal Project is the design, development and operation of an open cut coal project about forty-five minutes north of Mudgee in the Central Tablelands of NSW. Wilpinjong Coal Pty Limited, a wholly owned subsidiary of Excel Coal Limited, developed... more info.
Rix's Creek Upgrade,
Singleton NSW
Type: RECO TerraClass™ System
Bloomfield Collieries decided in December 2005 to upgrade their existing dump structure. The upgrade required that the existing Reinforced Earth retaining wall be pulled down and re-built to cater for heavy loadings, i.e increased dump vehicle capacity. The unique feature of this project was that the existing wall had to be pulled down and completely re-built within a 5 week mine... more info.
New Acland Coal Expansion - Darling Downs Region QLD
Type: RECO TerraPlus™ System
The New Acland open cut coal mine is located approximately 150km west of Brisbane in the Darling Downs region of South-east Queensland. In 2002 a 533m², 14m high Reinforced Earth Dump Structure was constructed to enable Run of Mine... more info.
Weakleys Drive Interchange,
Beresfield NSW
Type: RECO TerraPlus® System
The Weakleys Drive Interchange project involved the elevation of the New England Highway over the intersection with Weakleys Drive and the extension of Weakleys Drive to a new roundabout at Glenwood Drive. Located in the Hunter Valley region of NSW, the aim of the project was to reduce traffic congestion and increase safety for motorists.... more info.